in More Search Options

Network Performance Monitor Charts granularity

Last post 09-21-2007 10:57 AM by darryld. 1 replies.
Page 1 of 1 (2 items)
Sort Posts:
  • 07-27-2007 7:17 AM

    • Tomas
    • Not Ranked
    • Joined on 07-27-2007
    • Posts 10
    • Points 26

    Network Performance Monitor Charts granularity

    Is it possible to plot a more detailed chart than one value per 30 minutes?

    I can display a value in a more detailed wiew only by means of reading directly from the database table.

    It is  not very comfortable. I probably do not know a necessary setting. I have Version 8.2 May 2005, Database Engine MS Jet.

    Could somebody help me please?

    Thanks, Tomas

    • Post Points: 3
  • 09-21-2007 10:57 AM In reply to

    • darryld
    • Top 150 Contributor
    • Joined on 09-30-2004
    • United Kingdom
    • Posts 49
    • Points 120

    Re: Network Performance Monitor Charts granularity

    At the bottom of the graph there is a button labelled Custom Period - click on that and set the required period in the box provided

    • Post Points: 1
Page 1 of 1 (2 items)